Latest News

18 WJTS in.form: Holistic Wellness Expo @ The Tri-County Y (2/8/2023) 18 WJTS Newscast for February 8th, 2023 National Monument Honoring Fallen Soldiers Makes Indiana Debut in Huntingburg Lincoln Amphitheatre 2023 Performance Series Announced Dubois County Chamber to Hold Annual Luncheon & State of the Chamber 

Beginning on or around Monday, April 25 contractors will close U.S. 150 IN MARTIN COUNTY about a half-mile east of State Road 550 for a small structure replacement project. This project requires a full road closure to remove and replace a drainage structure. This will be the first of eight locations on this contract. To maintain access to local residents, each replacement has to be done separately. Each replacement is expected to take 2-3 weeks, depending upon weather conditions. The entire project is expected to last until late fall.

Throughout the operation, the road will be closed to through traffic. Local residents will have access up to the point of closure but all others should use the official detour following U.S. 50, S.R. 60, S.R. 37, and S.R. 56.

INDOT urges drivers to slow down and stay alert near crews.

Leave a Reply

Your email address will not be published. Required fields are marked *